The GC's page
Each GC contact gets one private link per job. No account, nothing to install. This is what Priya Shah would see on a phone or a desktop. Everything Northside Electric has sent is in one place.
Pier 9 Warehouse Retrofit
Hello, Priya
Waiting on you: 2
1 tag to sign · 1 question to answer
T&M tags 2
Written notices 1
- Notice of changeTag #1001: Reroute feeder around new mezzanine steelAcknowledged
Questions (RFIs) 1
- RFI 1 Panel LP-3 locationAnswer needed by Nov 24, 2026Answer
Daily reports 1
What they can do there
Sign a tag
With a finger or a mouse. The tag locks and you are told.
Reject it, with a reason
A reason is required, so you know what to answer.
Ask a question
It lands in the tag's conversation. Your answer shows on their page.
Approve a change order request
In full, or in part with an amount and a note.
Acknowledge a notice
Proof that your written notice was received, with a name and a time.
Answer an RFI
Right on the page. If the answer means extra work, you start a tag from it.
Download any PDF
Tags, requests, notices, RFIs and the daily reports you share.
See every version
When you revise a tag, the one they saw is kept, locked.
A rejection, start to finish
Tag #1002, Temporary power for racking installer. Every step is recorded with who did it, when, and how. When a tag is rejected, Valdek can draft your reply from what is on file: the contract rules, the photos, the notice and the history. You edit it and send it yourself.
Priya ShahGCrejected it
Temporary power for other trades is in your base scope. See spec section 01 50 00.
Nov 20, 2026, 9:12 AM UTC · through the private GC link
Sam OrtizNorthside Electricreplied
Priya, section 01 50 00 covers temporary power for our own work. This panel was for the racking installer, at your request on site, and it is not on our drawings. The tag has the photo from that morning. Happy to walk it with you.
Nov 20, 2026, 11:12 AM UTC · in Valdek
Priya ShahGCasked a question
Understood. Can you split out the panel rental from the labor?
Nov 21, 2026, 8:12 AM UTC · through the private GC link
Sam OrtizNorthside Electricpulled it back to revise it
Nov 21, 2026, 9:12 AM UTC · in Valdek · version 2
Sam OrtizNorthside Electricsent the revised version
Nov 21, 2026, 10:12 AM UTC · in Valdek · version 2
Priya ShahGCsigned it
Nov 22, 2026, 7:12 AM UTC · through the private GC link · version 2