ValdekDemo
Sample data. Northside Electric and everything in it is made up. Nothing here can be changed.
Pier 9 Warehouse Retrofit

The GC's page

Pier 9 Warehouse Retrofit · Bayline Construction

Each GC contact gets one private link per job. No account, nothing to install. This is what Priya Shah would see on a phone or a desktop. Everything Northside Electric has sent is in one place.

Pier 9 Warehouse Retrofit

Hello, Priya

Waiting on you: 2

1 tag to sign · 1 question to answer

T&M tags 2

Written notices 1

  • Notice of changeTag #1001: Reroute feeder around new mezzanine steelAcknowledged

Questions (RFIs) 1

  • RFI 1 Panel LP-3 locationAnswer needed by Nov 24, 2026Answer

Daily reports 1

What they can do there

A rejection, start to finish

Tag #1002, Temporary power for racking installer. Every step is recorded with who did it, when, and how. When a tag is rejected, Valdek can draft your reply from what is on file: the contract rules, the photos, the notice and the history. You edit it and send it yourself.

  1. Priya ShahGCrejected it

    Temporary power for other trades is in your base scope. See spec section 01 50 00.

    Nov 20, 2026, 9:12 AM UTC · through the private GC link

  2. Sam OrtizNorthside Electricreplied

    Priya, section 01 50 00 covers temporary power for our own work. This panel was for the racking installer, at your request on site, and it is not on our drawings. The tag has the photo from that morning. Happy to walk it with you.

    Nov 20, 2026, 11:12 AM UTC · in Valdek

  3. Priya ShahGCasked a question

    Understood. Can you split out the panel rental from the labor?

    Nov 21, 2026, 8:12 AM UTC · through the private GC link

  4. Sam OrtizNorthside Electricpulled it back to revise it

    Nov 21, 2026, 9:12 AM UTC · in Valdek · version 2

  5. Sam OrtizNorthside Electricsent the revised version

    Nov 21, 2026, 10:12 AM UTC · in Valdek · version 2

  6. Priya ShahGCsigned it

    Nov 22, 2026, 7:12 AM UTC · through the private GC link · version 2